Kluber Architects + Engineers

Henry Rockwell Baker Community Center Front Stair Replacement

This project generally consists of but not limited to: All materials and labor necessary to install exterior renovations as noted in the provided Project Manual and Drawings for the facility located at 101 S. 2nd Street, St. Charles, IL 60174 owned and operated by the Henry Rockwell Baker Memorial Community Center, Inc.

Status

Bidding Closed

Prebid Date4/3/24 11:00am

Bid Date4/23/24 10:00am

Company & Contacts

Kluber Architects & Engineers
Lauren Ruhl  
630-406-1213

Location

St. Charles, Illinois 60174

The Henry Rockwell Baker Memorial Community Center, Inc. will receive separate sealed bids

until 10:00 AM on Tuesday, April 23, 2024, at the Baker Community Center, 101 S. 2nd Street,

St. Charles, Illinois, for the Front Exterior Stair Replacement.

This project generally consists of but not limited to: All materials and labor necessary to install

exterior renovations as noted in the provided Project Manual and Drawings for the facility

located at 101 S. 2nd Street, St. Charles, IL 60174 owned and operated by the Henry Rockwell

Baker Memorial Community Center, Inc.

Bid documents will be available from Accurate Repro, Inc.’s Planroom beginning Wednesday,

March 27, 2024, at 9:00am. Plans are available for printing (at bidder’s expense) or download

(no charge to bidder). Phone: (630) 428-4433 www.accurateplanroom.com.

The above bids will be received and privately opened at the Henry Rockwell Baker

Memorial Community Center, Inc.

Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the

successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and

Material Payment Bond, and required proof of insurance following the award of a contract.

A non-mandatory pre-bid meeting and walk-through for General Contractors will be held at

11:00 a.m., Central Standard Time (CST), on Wednesday, April 3, 2024, at the Henry Rockwell

Baker Memorial Community Center, Inc. located at 101 S. 2nd Street, St. Charles, IL.

A second informal walk-through of the site will occur at 11:00 a.m., Central Standard Time

(CST), on Wednesday, April 9, 2024, for General Contractors and their Subcontractors.

The Henry Rockwell Baker Memorial Community Center, Inc. reserves the right to reject any or

all proposals or to accept any proposals which, in its judgment, will be to the best interest of the

Owner. Only bids in compliance with the provisions of the specifications will be considered.

All bidders must comply with the applicable Illinois Law requiring the payment of Kane County

prevailing wages by all contractors working on public projects, and bidders must comply with the

Illinois Statutory requirements regarding labor and bidding, including Equal Opportunity Laws.